The client wanted to recycle concrete slabs to create a small patio and work area. Secondly the steps leading from the side of the house were considered unsuitable for gaining access to the garden. The solution was to build a landing area to transition from the side of the house into the garden. The final steps will be to apply the jointing between the slabs and cladding
Month: September 2024
The client wanted a low-maintenance garden and patio. The existing slabs were upcycled and repositioned in the corner. Over 240 charcoal grey slabs were placed. A last minute discovery of the tree roots close to the surface resulted in a step being added around the base of the tree. Stone cobbles were used to break up the garden in sections.
This was a patio for the client to enjoy the non-existent summer. It was a circular pack that took a couple of days to build and was a pack from B & Q